Overview

This new three-story high school was completed ahead of schedule and accommodates up to 2,750 students. The building was designed to have a collegiate feel with classroom space, informal meeting areas to facilitate project-based learning, a large outdoor courtyard, and a fine arts wing with an 800-seat auditorium and black box theater. The project sits on a tight site next to a major thoroughfare, and the new building was constructed while the existing facility remained operational.

Satterfield & Pontikes used our technology-driven process to optimize construction phasing. Our team determined the best sequence of Tiltwall panel pours and erection and tied the plan to the schedule. From that, we created a sequencing video for all trade partners and stakeholders to track construction activities.

  • General Contractor Education CTE Construction
  • General Contractor Education CTE Construction
  • General Contractor Education CTE Construction
  • General Contractor Education CTE Construction

Details

Awards:
  • Tilt-Up Concrete Association Outstanding Example of Tilt-up Concrete Construction
  • Texas Association of School Administrators/Texas Association of School Boards Design Award
S&P Services:
  • Construction-Manager at Risk
  • Preconstruction
  • BIM-Based Management
  • LEED New Construction (NC) Silver Project
Owner

Houston ISD

Location

Houston, Texas

Size

367,118 SF 

SAM HOUSTON MATH, SCIENCE AND TECHNOLOGY CENTER
CENTER OF EXCELLENCE IN EDUCATION

“During construction the new 380,000 square foot tiltwall structure was built on the campus’s existing play fields while students and faculty continued to occupy the existing buildings. This created unique site logistics challenges to overcome throughout construction. Satterfield & Pontikes worked to provide a safe and controlled environment throughout construction ensuring hazards are kept to a minimum.”

Steve Parker, AIA , Principal, Stantec

Similar Projects

  • JFK Terminal 4 Redevelopment Phase 1

    Overview The joint venture of Satterfield & Pontikes and ...

    Categories: Aviation
  • JFK Terminal 4 Redevelopment Phase 2

    Overview Construction Manager – Agency Services for phase II ...

    Categories: Aviation
  • LAX Terminal Relocation

    Overview The LAX 2017 Delta Relocation Enabling Project was ...

    Categories: Aviation