Overview

The LAX Delta Relocation Enabling Project allowed the relocation of Delta Air Lines from Terminals 5 and 6 to Terminals 2 and 3. Additionally, the twenty-two airlines occupying Terminals 2 and 3 were moved to Terminals 5 and 6 concurrent with Delta’s move. This was the largest airline relocation in aviation history.

The project required S&P to coordinate with multiple stakeholders and the airport authority. The relocation necessitated numerous upgrades and expansion of the existing baggage handling system (BHS) while maintaining airline operations. Multiple critical path tie-ins were conducted to meet the deadline. S&P finished all critical path scope on or ahead of schedule while limiting change order costs to under 5% of total BHS contract value.

Details

S&P Services:
  • Construction management
  • Project controls
  • Quality assurance and quality control program
  • Testing and commissioning
  • Project close-out
  • Cost control
Owner

Delta Air Lines

Location

Los Angeles, CA

Size

658,000 SF

Similar Projects

  • JFK Terminal 4 Redevelopment Phase 1

    Categories: Aviation
  • JFK Terminal 4 Redevelopment Phase 2

    Categories: Aviation
  • LaGuardia Airport Redevelopment

    Categories: Aviation