Founded in 1989, Satterfield & Pontikes Construction (S&P) is a builder as firmly rooted in traditional values as we are relentless in our pursuit of cutting-edge tools and technology. An ENR Top 400 Contractor, S&P uses advanced technology to maximize value for our clients, providing a full range of preconstruction, construction and consulting services.

713-996-1300
info@satpon.com
+ 713-996-1300
info@satpon.com

May 2021

[vc_row][vc_column width="2/3"][vc_column_text]Satterfield & Pontikes has been recognized once again in the ENR Top 400 Contractors List. We are #satponproud to rank #148 in the Top 400 List moving up from #188. Thanks to our S&P team for making this achievement possible during a difficult year. The Top 400 Contractors list is published annually in May, ranking the 400 largest U.S.-based general contractors based on construction contracting-specific revenue. Since 2000, S&P has participated and ranked in the ENR Top 400 Contractors.[/vc_column_text][/vc_column][vc_column width="1/3"][vc_single_image image="6771" img_size="full"][/vc_column][/vc_row]

[vc_row][vc_column][vc_column_text]Satterfield & Pontikes has been awarded a $43 million additions and renovations project for Friendswood High School in Friendswood, Texas. The project is being delivered as a Construction Manager at Risk (CMR) in partnership with PBK. The scope of the work includes: New fine arts addition Renovation of existing auditorium & fine arts wing Renovation of existing CTE spaces New competition gym and support spaces Locker room renovations Reconfiguration of athletic fields and spaces Additional parking and detention [/vc_column_text][/vc_column][/vc_row]

[vc_row][vc_column][vc_column_text]Satterfield & Pontikes is excited to announce we were recently awarded a $110 million project for Cypress Fairbanks ISD in Cypress, Texas. The project is a new five-story district instructional support building and a new, state-of-the-art district visual and performing arts center (VPAC.) This project is scheduled for completion in December 2022 on a 26-acre site adjacent to the first district high school, originally built in 1935 and since expanded. The 225,000-sq-ft, five-story admin building includes a conference center, and the 88,000-sq-ft arts center building will be connected to it and serve the district for visual and performing arts programs. The building will include a new multi-level auditorium centered by a 1,500-seat auditorium and other fine arts spaces.[/vc_column_text][/vc_column][/vc_row]

[vc_row][vc_column][vc_column_text]Our central Texas team recently showcased their work to a group of Marble Falls High School students. Students got hands-on experience with our Building Information Modeling (BIM) process that brings efficiency and accuracy to every project. Our project team then led the engineering and architecture students on a tour of the projects at their high school, including a first look at the new administration and common spaces. We’ve recently completed several projects across the Marble Falls Independent School District with Huckabee. “We take great pride in the work we do for schools,” said Calen Shearer, director of business development for central Texas. “At the end of the day, the work is really about the students, and this event allowed us to share our field of expertise with them.”[/vc_column_text][/vc_column][/vc_row]